Monday, April 29, 2013

The Scorpion Six-Manifold Chilling Station, Trial Run

By Steve Siciliano

We have been busy making the final preparations for what is shaping up to be the largest American Homebrewers Association Big Brew in the thirteen-year history of this annual spring celebration. I was recently informed that Grand Rapids mayor George Heartwell will stop by the Calder Plaza this Saturday and will join us in the simultaneous, country-wide toast to the enriching hobby of home brewing.

Yesterday Greg Masck, Boyd Culver and I did an on-site test run for the custom-built, six-manifold chilling station that Boyd, the owner of Coldbreak Brewing, designed and fabricated. We tapped into a fire hydrant on Monroe, ran a fire hose up a twenty foot wall to the plaza and ran the hose another 250 feet to the chilling station. I am happy to report that the Scorpion worked perfectly. See below for pictures of the setup.

Tapping a hydrant on Monroe 

From the hydrant to the wall

Climbing the 20-ft wall

Behold, the Scorpion!

No comments:

Post a Comment